nctcog logo
 
transportation label
navigational bar
 

TSM Project Implementation Program Area

Traffic monitoringThe TSM (Transportation Systems Management) Project Implementation program area focuses on improving the operational characteristics of the system through Transportation Systems Management strategies. The Thoroughfare Assessment Program (TAP) aims to maximize the effectiveness of arterial traffic signal systems and traffic flow through operational improvements in regional thoroughfare corridors.  An LED Traffic Signal replacement program is currently underway.  Also included in this area is development of detailed traffic flow information on the region’s freeway system obtained through the use of low-level aerial photographs. This information will be used to identify freeway system deficiencies including system bottlenecks as well as other operational constraints.

Topics

Staff

  • Alauddin Khan, Transportation Planner II (Lead)
  • Barbara Walsh, Administrative Assistant I
  • Natalie Bettger, Senior Program Manager

Contact Information

 
 CONTACT US | SITE MAP | LEGAL | SYSTEM REQUIREMENTS
 North Central Texas Council of Governments | 616 Six Flags Drive P.O. Box 5888 Arlington, TX 76005-5888
 Main Operator: (817) 640-3300 | Fax: (817) 640-7806
View contact information for each of our offices. This is where you will find a list of our agents also. Info

A number of snack vending machines are electrically operated. There are snack vending machines that are see-through or have fronts which are glass-made. Various snack vending machines can only dispense as little as six or ten types of snacks or it can sell a wide range of snack and beverage choices.